REASSEMBLY CHECKLIST -- HEAD GASKET REPLACEMENT

 

¨ Install New Head Gasket.  Right side up! No sealant.

¨ Install Exhaust Sealing Rings.  In cross-over flanges. (see step 27)

¨ Install Head/Headers.  Position head with the headers attached. 

¨    Install Header to Cross-over bolts.  Align and insert bolts. Don't torque yet.

¨    Torque Head Nuts. (See step 43, figure 5)

¨    Torque Exhaust to Cross-over Bolts.  15 ft. lbs. (see step 27)

¨    Install Front Water Passage Head Bolts.  15 ft. lbs. (see step 42, figure 5)

¨    Replace Rear Coolant Neck and CV Bracket. 14 ft. lbs. (Step 41, figure 4)

¨    Replace Thermal Switch and its Vacuum Lines.  (Step 41, figure 4)

¨    Replace Cycling Valve and its Hoses. (Step 41, figure 4)

¨    Replace Mount for Front Coolant Neck. 15 ft. lbs. (step 40, figure 1)

¨ Replace Front Coolant Neck on Mount.  15 ft. lbs. (step 40, figure 1)

¨    Replace Front Coolant Pipe and Hoses.  7 ft lbs. (Step 39, figure 1)

¨ Install Cam Tower Gasket. Right side up! No sealant. (see figure 5)

¨    Apply Assembly Lube to Lifers.  (see step 38)

¨ Confirm Motor is still at TDC No.1.

¨ Install Cam Tower with Cam Gear Mark Set to TDC.  15 ft. lbs. (see step 38)

¨ Install Front Timing Cover/Cam Tower Bolts. 6 ft. lbs. (see step 35)

¨ Replace Six Cam Tower Access Plugs.  29 ft. lbs.  (see step 34, figure 2)

¨ Install New Oil Filter. (see step 33)

¨ Put Back Power Steering Reservoir. (see step 32)

¨ Re-attach Co2 Test Port. (see step 31)

¨ Re-attach Electronic Test Port to Cam Tower Hoist Bracket. (see step 30)

¨ Set Timing Belt Tension.  (see step 29)

¨    Install Distributor Mounting Cover. 6 ft. lbs. (see step 26)

¨ Install Timing Belt Covers. 6 ft. lbs. (see step 26)

¨ Install Heater Pipe and Hoses.  (see step 35)

¨ Reinstall Accessory Belts.  (see step 25)

¨ Position Intake Gaskets.  (line up injector notches; No.1 goes on upside down)

¨ Position Intake with Dip Stick and Fuel Rail Attached.

¨ Install 8 Intake Bolts.  15 ft. lbs.  (ensure gaskets are in place)

¨ Tighten Perch Bolt at Front of Intake. (see step 22, figure 1)

¨ Re-attach O2 Connection Bracket. (see step 21)

¨ Install Allen-bolts at Rear of Intake.  (see step 20, figure 3)

¨ Re-attach Vacuum line under Throttle Body. (see step 19)

¨ Install Fuel Rail to Can Tower Bolts.  6 ft. lbs. (see step 18, figure 2)

¨ Re-connect Injector Wires/Replace Plastic Cover. (see step 17, figure 2)

¨ Re-attach Fuel Lines. (see step 16, figure 2)

¨ Re-attach Vacuum Lines to FPR and Damper. (see step 15, figure 2)

¨ Re-install Vacuum Fitting Lines on Intake. 7 ft. lbs. (see step 14, figure 2)

¨ Re-install Vacuum Hoses Between Runners. (see step 13, figure 1 and 3)

¨ Re-connect Throttle Position Sensor Connector. (see step 12, figure 1)

¨ Re-install/Adjust Throttle Cable. (see step 11, figure 1)

¨ Re-install/Adjust Cruise Control Cable. (see step 10, figure 1)

¨ Re-install Distributor Cap and Wires.

¨ Re-install I/C pipes and  Coupler Hoses. (see step 8, figure 1)

¨ Re-install Boost Bolt in I/C Pipe. (see step 8, figure 1)

¨ Re-connect Hose from I/C to BOV. (see step 8, figure 1)

¨ Re-install Air Filter Box and Air Flow Meter. (see step 7)

¨ Refill Oil.

¨ Refill Coolant/Vent.

¨ Re-connect Battery.

¨ Start Car -- Check for Fuel or Coolant Leaks.

¨ Replace Belly Pans.

¨ Lower Car.

¨ Drive it like you stole it.
 

BACK TO HEAD GASKET REPLACEMENT PROCEDURE

BACK TO HOMEPAGE