|
Wire
connections to this switch:
Route wire
from fuse box to this switch.
Note:
Access to the rear of the IP is required.
Route wire
from this switch through the center tunnel area.
Note:
Where this wire passes into the tunnel, insert the wire into
the length of heat shrink tubing. The tubing acts as a
protective sleeve and allows the wire to "fish" through the
tunnel easier.
© 2005
Sherwood Lee
|